How to install lp smartside trim siding.
Lp siding installation instructions.
For installations over masonry or concrete walls the wall.
Subject to such installation are excluded from coverage under the lp smartside limited warranty.
Do not extend the siding or trim into the kick out flashing or gutter.
The installation instructions recommend nails with a shank diameter of at least 113 inches and a head diameter of at least 27 inches.
Spaced a maximum of 24 inches 610 mm o c.
Install step flashing with minimum 4 in.
Download our helpful installation instructions and watch our informative how to videos.
With four components of protection the process adds strength and helps our products withstand impacts freeze thaw cycles high humidity fungal decay and termites.
Lp canexel prefinished siding delivers the authentic look of traditional wood with the strength of treated engineered wood at a cost effective price.
The framing shall be of adequate.
Installation is easy and the finished result is a durable strong and beautiful exterior.
To allow for convective ventilation between framing spaced.
Lp smartside trim siding products are treated with our proprietary smartguard process.
Upper leg properly integrate flashing with the secondary water resistive barrier.
Overlap successive courses of siding a minimum of 1 in.
Tools and materials as in standard construction practices install smartside siding by nailing to studs spaced 16 inches on center using hot dipped galvanized nails.
Shall be furred out and open at the top and bottom of the wall.
Upper leg properly integrate flashing with the secondary water resistive barrier.
Use housewrap flashing tape z flashing or other items as needed to maintain the counterflashing principle.
All exposed wood substrate must be sealed in a manner that prevents moisture intrusion and water build up.
Lp smartside trim and fascia can be applied directly over materials such as siding or fastened directly to structural members.
16 inches 406 mm o c.
Install kick out flashing to direct the water into the gutter install step flashing with minimum 4 in.